亚洲成AV人片在线播放无码,中文字幕色AV一区二区三区,国产产无码乱码精品久久鸭,亚洲AV无码一区二区大桥未久

Wecome to FoShan Great wall Cold Trade Project Co.,Ltd!


{"img":"","passBy":"0","picBd":"0","size":"1","bdSize":"1","cwidth":22,"cheight":22,"picBdRadio":"0","borderType":"solid","jump":"0","definedUrl":"","isPicBd":"0","effectBdLine":"solid","image":"http://oss.xinghuo86.cn/969507019423856/980935902232629.png","picWidth":"22","picHeight":"22","inpColor":"","color":"#000000","type":0,"effectBdColor":"#000000","hasEdit":true}

CONTACT US

   Add:6 Tongji West Road,Foshan,Guangdong

   Tel:+86-757-83322438

           +86-757-83351198 83353010

   Fax:+86-757-83363438

   E-mail:cclq@vip.163.com

Project Case
高明區(qū)新婦幼保健院
  • 產(chǎn)品詳情

  高明區(qū)新婦幼保健院項(xiàng)目位于荷富路以西,三寶路以北。建筑面積3萬多平方米。新院包括有門診綜合樓、醫(yī)技樓、住院樓、后勤樓等。2011年3月,經(jīng)過我司多方努力,成功承接了住院樓(九層)及門診樓(四層)的空調(diào)工程。該項(xiàng)目的空調(diào)系統(tǒng)采用水冷冷水型中央空調(diào)。經(jīng)過我司的嚴(yán)謹(jǐn)施工、調(diào)試,于2012年2月正式投入使用。